Architectural elevation drawing showing a large industrial building labeled "Eppendorf," with loading docks, smaller attached structures, and vehicles visible on the left side.
  • Structural Engineering

New Production Building (Hall 9)

New construction of a production hall with cleanroom facilities for medical technology equipment.

The production hall with integrated cleanroom for medical devices was founded on a continuous reinforced concrete slab. The basement was constructed using solid construction methods, while the ground floor was built with precast reinforced concrete elements. This construction approach enables a high degree of precision in assembly.

Client
Eppendorf AG
Building owner
Eppendorf AG
Architect
industrie planung GmbH
Gross floor area
5919 m²
Test/construction period
2018 - 2019
Completion
2019
Location
Oldenburg
JBO Team
Markus Gilgen M.Sc.
Services Provided

LPH 1-4 & 6
Structural engineering
Structural fire protection
Excavation shoring

Looking for a reference?

We've implemented many complex projects – we would be happy to present you with a reference that fits your planning or construction project.
Contact us
Luftaufnahme von Wellen, die an die Küste schlagen und weißen Schaum vor dem tiefblauen und türkisfarbenen Wasser bilden.
New Production Building (Hall 9)
Ein allgemeines Benutzerprofilsymbol mit der weißen Silhouette einer Person auf hellblauem Hintergrund.