This project involved a tied-arch bridge for a two-lane road, spanning 56 meters over a canal. The bridge is 11.75 meters wide, and its steel arch rises to a height of 9.5 meters. The bridge deck consists of a reinforced concrete slab supported by a composite beam grid. The abutments are deep-founded on piles.
New Tied-Arch Bridge, Hamburg
Building owner
Aurubis AG
Test/construction period
11/2017 - 12/2019
Test engineer
Dipl.-Ing. Horst-Ulrich Ordemann
Services Provided
Structural-static review during Design Phases 4 and 5, as well as engineering construction supervision during Design Phase 8.