Architectural elevation drawings showing the west and south sides of a multi-story brick building with balconies and large windows.
  • Structural Engineering

New Construction Kara Hauptstraße 46

New construction of a mixed-use commercial and residential building with underground parking, built using reinforced concrete and a white tank (waterproof concrete) system.

The three-story building (32 × 13 × 14 m) combines commercial and residential spaces. The underground parking garage has been constructed as a waterproof “white tank” structure. The top floor was designed and realized as a recessed floor (penthouse level).

Building owner
Fatma & Suayip Kara
Architect
Mustafa Sahin
Gross floor area
2655 m²
Test/construction period
06/2020 - 12/2021
Completion
2022 – Early 2023
Location
Neu Wulmstorf
JBO Team
Dipl.-Ing. Dschingis Amin
Services Provided

Design Phases 1–6
Structural engineering
Structural fire protection
Thermal and acoustic insulation certification

Looking for a reference?

We've implemented many complex projects – we would be happy to present you with a reference that fits your planning or construction project.
Contact us
Luftaufnahme von Wellen, die an die Küste schlagen und weißen Schaum vor dem tiefblauen und türkisfarbenen Wasser bilden.
New Construction Kara Hauptstraße 46
Ein allgemeines Benutzerprofilsymbol mit der weißen Silhouette einer Person auf hellblauem Hintergrund.